Commercial Testimonials

WE ARE PROUD OF OUR MANY HAPPY CUSTOMERS!

YMCA Logo YMCA Building

Date: 08/19/2011
Customer: YMCA - "The Y"
(multiple locations)



Area of work: Ceramic Tile in locker rooms; hallways, and pool deck;
Problem: Members were slipping on wet ceramic tiles throughout locker rooms and pool areas;
Solution: 8 minute exposure / Stone-Grip.

Review / Response: Unbelievable! Large improvements in traction with no appearance change. We will be notifying other YMCA locations of our success with SlipDoctors.

Mop Kitchen Mop Kitchen

Date: 07/15/2010
Customer: Fairfield Inn by Marriott


Area of work: Ceramic Tile in entrance, lobby and hallways;
Problem: Hotel guests tracking rain onto lobby floor and water dripping from pool guests onto tile hallway near elevator bank;
Solution: 10 minute exposure / Stone-Grip.

Review / Response: Problem Solved! The hotel no longer has issues with slips on these areas.

Rosewood Hotel Mandion Turtle Creek


Date: 07/02/2011
Customer: Rosewood Hotels

Area of work: 1200 Square feet of Quarry Tile on stairs, sundeck and handicap-equipped showers;
Problem: Client had issues with slippery tiles and stairs around pool and shower tiles;
Solution: 10 minute exposure / Stone-Grip.

Review / Response: Hotel Management was satisfied with the results and have contracted more work with us as a result.
Four Seasons Pool Four Seasons
Date: 07/02/2011
Customer: Four Seasons Hotels

Area of work: 4000 square feet of tiles surrounding swimming pool;
Problem: Client had issues with slippery tiles near the swimming pool.
Solution: Clear non-slip spray coating

Review / Response: Hotel Management was satisfied with the results of the treatment and feels that the likelihood of an accident has been reduced.

City Of Dallas City of Dallas Aquarium
Date: 08/19/2010
Customer: City of Dallas Aquarium


Area of work: Sloped concrete areas surrounding Children's Sting-ray Petting Tank;
Problem: Client wanted higher traction levels of polished concrete surrounding the tank;
Solution: 10 minute exposure / Stone-Grip.

Review / Response: Substantial improvement in safety due to increased traction, especially on the slopped sections.

MLB Logo Texas Rangers Date: 03/25/2011
Customer: Texas Rangers MLB Baseball

Area of work: Restroom Tiles; Steps in stadium;
Problem: Client's liability claims for slip and fall accidents associated with public restrooms and slick, painted steps throughout stadium;
Solution: 10 minute exposure / Stone-Grip in the Restrooms. New Slip-Resistant Epoxy Paint for steps.

Review / Response: Management is thoroughly pleased both with the results in the restrooms and on the stadium stairs.

Contact SlipDoctors for many more references and prior jobs. 888-436-5404